Skip to main content

About your Search

20121201
20121231
STATION
SFGTV2 4
LANGUAGE
Search Results 0 to 3 of about 4
SFGTV2
Dec 4, 2012 10:30am PST
plan for that in a minute. other work we've done worked with dpw to develop an initial design concept for that connector road to show it's a feasible concept. we've done two rounds of extensive community outreach to share our work as well as interagency coordination with dpw, mta, cal train as well as other local agency partners. diving a little more into the community outreach we've done, we have worked through two prerobust rounds of outreach. first of those were back in spring. we did an open house and other presentation to present the work we had done in the first few months after we got that appropriation and get the community's feedback. we came back to the community in november to present our draft back recommendation how we incorporated a lot of that community feedback before coming here to the board. each of those rounds included an open house with pretty good solid participation as well as notification for that each round including multilingual efforts with efforts to everyone within a half a mile. additional fliers and businesses, neighborhoods, churches, community groups t
SFGTV2
Dec 5, 2012 8:00pm PST
to say. we're here -- we got the appeal from the dpw and we were asked to do some things. we distributed keys and went with the hours of operations and applied for the property building permits that the department of building inspection and went through planning. so we have got gone through the dpw, dbi approved the plans. we haven't quite got it all signed off because we were told to stop on it somewhere along the line when the dbi permit got approved. we did the load studies for the people coming and going and access and push bars and the keys. so it's pretty easy to walk in and out of the door, it works and it can be accessible, if it needs to be. i'm not sure how you would get a wheelchair in the building once it's in there, but it's not a problem. we have to do something with the grade there, but we haven't finished a lot of this stuff and somebody was talking about the structure. we haven't completed it because we were told to stop on it. which they are all pretty simple things to complete, the structure. i think it's a good thing for the building. it keeps them clean
SFGTV2
Dec 11, 2012 2:00pm PST
initiative was a little over $11,000. most of that goes to dpw for installation. the equipment and supplies themselves were all donated by so-lon, and then we had a little bit of management staff time here at the puc to bring it to $11,000 total. >> thank you. >> other comments. >> with respect to the installation, is this an installation agreement or some record between the public utility commission and the department of public works? >> yes, typically we have a work order. they provide with scope and cost, and we have a work order agreement with them, and that's documented within that process. >> so you issue a work order. and then they determine what the scope of work is? >> we tell them what our needs are, and then they provide us with a scope and cost. and then we say, okay, if we are comfortable with that assessment of the cost and the scope covers the work we identified that we needed. then we work order the funds to dpw. it comes to us like a bid from dpw. >> is that in the record? is the actual response, the department of public works is that in the record? >> typically yes, it's p
SFGTV2
Dec 27, 2012 8:30am PST
come together between rec and park and the port and, of course, our dpw department. i want to thank the mayor and your commissioners for really helping to see this through. and i want to take a moment and thank the community. so many of you here are our merchants, are our members of labor, are our neighborhood leaders who have really come together. we see representatives from our hotels, folks who represent every type of business along in waterfront big and small. but for your support over the years, we wouldn't be here today. when i came in office four years ago, i was told by the constituents of these neighborhoods that we needed to invest in our waterfront. and four years later we're on the eve of cutting the ribbon for the explore atorium. * we just passed a bond measure that will bring two waterfront parks a few blocks from here. this won be possible but for the vision and the foresight that we all have about what we want a 21st century waterfront to look like. i want to thank you for that. i don't see any of my colleagues here. i'm going to say the following. i think this may
Search Results 0 to 3 of about 4